Boston, MA
Expertise
Mechanical
Electrical
Plumbing
Fire Protection
Size
107,000 SF
Bala delivered engineering solutions for the all-electric, office-to-laboratory conversion of a 9-story, 107,000 SF building in Boston's Fort Point District. The project supports life science tenants by offering a sustainable, high-performance space.
To meet future BERDO 2.0 City emission standards and requirements from Boston’s Planning and Development Authority (BPDA), our design utilized system reuse where possible, and highly efficient, all-electric systems. Bala came up with a flexible approach to support the future lab requirements and meet emission/energy targets, while also reducing the need for seismic upgrades.
Fast Facts:
25%
Less Energy Consumption
3%
Fossil Fuel Usage